Engineering decoration sequence

1. Design implementation to the property for all kinds of decoration procedures.
2. Enter the site for construction and demolition works, and then clean up the site.
Purchasing materials: purchase wires, switches, sockets and pipes; choose and buy Tiles, sanitary wares, stones and cabinets to lay a good foundation for kitchen and toilet construction.
3. On site disclosure, setting out, determine the direction of power supply wire, CATV, communication and security lines; determine the number of switches and sockets; determine the direction of water supply and drainage pipelines; determine the elevation and position of cabinets, cooking tables, baths, etc.; test and revise the benchmark of doors and windows.
4. After setting out, the preliminary construction of water and electricity shall be carried out, and the concealed engineering experience shall be closed. Wall tiles are laid on the clay kitchen and toilet.
5. Buy all kinds of wood, board, panel, hardware and other materials
6. Carpentry construction, water and electricity engineering cooperation continue to install water and electricity, some hardware into the site.
7. Floor base, the first construction of carpentry on site has been completed.
8. Increase items and reduce items, and accept the project in the middle term.
9. Purchase paint and coating, oil workers enter the site for construction, and jointly construct on site and outsourcing factory.
10. Floor paving, sanitary ware installation and heating installation
11. Hardware, equipment mobilization, installation of lamps and lanterns.